ROB Sangram Nagar – Aurangabad
This project involved constructing an ROB with 11 spans of 20m each on the Dargah side, 7 spans of 20m on the Beed-bypass side & solid approaches of 208m with slip roads. It’s overall length was 574.20m.
- Super-Structure:
- i) Pre-cast PSC 4 girder system with cast in situ diaphragms and deck slab with 1.5m Cantilever on either side.
- ii) Bearing- POT – PTFE
- iii) Expansion joint - strip seal type
- Total Cost of Project Rs. 27.16 crores