Conversion of Pedestrian Subway to Motorable Subway, Goa connecting Goa Medical College & Goa Dental College on NH17

Kashec was responsible for the conversion of the subway which had a total length of 433.50m.

  • GMC Side 240 m,
  • GDC Side 193.50 m.,
  • Total Width of Subway 7.50 m.
  • Carriageway: 6m, Foot path 1.50 m
  • Total cost of Project: 9.50 cores