Conversion of Pedestrian Subway to Motorable Subway, Goa connecting Goa Medical College & Goa Dental College on NH17
Kashec was responsible for the conversion of the subway which had a total length of 433.50m.
- GMC Side 240 m,
- GDC Side 193.50 m.,
- Total Width of Subway 7.50 m.
- Carriageway: 6m, Foot path 1.50 m
- Total cost of Project: 9.50 cores
.jpg)