Development of Inland Waterways at Agardanda
This project involved a pioneering low cost sloping submerged piled jetty resulting in a very cost effective alternative to creek bridges that would not typically be built in rural areas. IWT development at Agardanda port has a RO-RO type end birthing jetty along with a fully modern ship shaped terminal building.
- Offshore details: Total Length of jetty – 56m, Diameter of pile is 1200mm, No. of piles are 18.
- Onshore details: Building area – 617 Sq.m., Parking & open space area – 3200 Sq.m., Bund area – 6237 Sq.m.
- Total cost of Project: Rs. 10.55 crores
