Demolition & reconstruction of existing jetty at Kala Academy

Kashec have successfully replaced the existing corroded steel jetty with a state of the art new jetty.

  • 120m long 60m wide concrete jetty
  • 2 nos. of floating concrete pontoons.
  • State of the art MEP facilities to service yachts and boats.
  • Total cost of project: Rs. 25 crores