Laxmi Mandir to Dhayari Phata to Nanded City (Sinhagad Road)

Kashec worked on an 8km road which was constructed in 'Bituminous' as well as 'Pavement Quality Concrete'. It includes:

  • The successful construction of 3 bridges, the combined length of which is approximately 110m.
  • Widening of existing road to development plan (DP) width of 36m by providing 6 lane carriageway with median.
  • Construction of 2.5m wide carriageway using 100 mm thick paver blocks on both sides with storm water drains below.
  • Cycle track 2.1m wide with 60mm thick paver blocks on both sides of the road.