Copyright 2020 Kashec Ltd Consultants for the Built Environment
Contact us Phone: +44(0) 1763 247131
Previous project Next project
Bradwell Power Station Location: Southminster, CM0, United Kingdom Service: Structural assessment Team Client: BNFL Magnox Description Bradwell nuclear power station was the first nuclear power station in the UK to be placed into quiescent state in 2019. The construction began in December 1957, and electricity generation started in 1962. An assessment of the existing structures was required in preparation of the power station decommissioning plan. Project Design Kashec prepared structural schemes for the proposed decommissioning of the power station. We carried out structural assessments of the existing structures in order to reduce the size of the reactor buildings.
Get in Touch Projects
Previous project Next project
Copyright 2020 Kashec Ltd  Consultants for the Built Environment
Contact us Phone: +44(0) 1763 247131
Get in Touch
Bradwell Power Station
Location: Southminster, CM0, United Kingdom Service: Structural assessment Team Client: BNFL Magnox Description Bradwell nuclear power station was the first nuclear power station in the UK to be placed into quiescent state in 2019. The construction began in December 1957, and electricity generation started in 1962. An assessment of the existing structures was required in preparation of the power station decommissioning plan. Project Design Kashec prepared structural schemes for the proposed decommissioning of the power station. We carried out structural assessments of the existing structures in order to reduce the size of the reactor buildings.