Berkeley Power Station Location: Berkeley, GL13, United Kingdom Service: Structural design Team Client: BNFL Magnox Description The construction of the power station began in 1956 and electricity generation started in 1962 and ran for 27 years to 1989. Berkeley was the first commercial nuclear power station in the United Kingdom to be decommissioned following its closure in 1989. Structural works were required in preparation of the power station decommissioning process. Project Design Kashec prepared structural schemes for the proposed decommissioning of the power station. We carried out the structural design of the weather tight protective roof. We prepared the structural schemes for the demolition works required to reduce the height of the reactor buildings.
Get in Touch Projects
Previous project Next project
Location: Berkeley, GL13, United Kingdom Service: Structural design Team Client: BNFL Magnox Description The construction of the power station began in 1956 and electricity generation started in 1962 and ran for 27 years to 1989. Berkeley was the first commercial nuclear power station in the United Kingdom to be decommissioned following its closure in 1989. Structural works were required in preparation of the power station decommissioning process. Project Design Kashec prepared structural schemes for the proposed decommissioning of the power station. We carried out the structural design of the weather tight protective roof. We prepared the structural schemes for the demolition works required to reduce the height of the reactor buildings.
Copyright 2020 Kashec Ltd  Consultants for the Built Environment
Contact us Phone: +44(0) 1763 247131
Get in Touch
Berkeley Power Station